City of Savage Home Page  Link to the City Gov't Page  Link to Departments and Services Page  Link to New to the City Page 
City of Savage logo
Link to Community Profile  Link to Frequently Asked Questions  Link to Helpful Links  Site Index   
Google
The Web City of Savage

DEPARTMENTS & SERVICES  

Grading Program Page Header

What's Inside
Grading Program Left Nav

AdministrationAdministration
FinanceFinance
Public WorksPublic Works
Utility ServicesUtility Services
Parks, Recreation, & Natural ResourcesParks
Public SafetyPublic Safety
EngineeringEngineering
Day to Day OperationsDay-to-Day Operations
Grading ProgramGrading Program
Current ProjectsCurrent Projects
Hamilton ProjectHamilton Project
Water ResourcesWater Resources
Engineering FAQsEngineering FAQs
Building InspectionsBuilding Inspections
Economic DevelopmentEconomic Development
Community DevelopmentCommunity Development


The City of Savage has established a grading program to ensure that the City's minimum grading requirements are met in all developments and that the property conforms to the adjacent properties.

Grading Program Information!

Homeowners are responsible for preventing erosion until turf is established and approved.

Sod and landscaping materials must be at least 6 inches below your homes siding.

Up to 45 days after the property closing date:
The homeowner should check with the builder to make sure an as-built survey (for a detailed description, click on link) has been submitted to the City for approval. Sod, irrigation systems, and landscape materials may not be installed until the as-built survey has been approved. This typically takes two weeks from the time it is submitted to the City.

Up to 70 days after the as-built survey has been approved:
Once the as-built survey has been approved, you may begin installing trees and establishing acceptable ground cover. Acceptable ground cover includes sod, turf seed, mulch and/or rock landscaped areas and native grasses. Call the City Engineering Division at 952-882-2671 if you have questions about acceptable ground covers. Ground cover and landscaping must be established within 70 days from the date the as-built survey was approved. Exceptions are allowed during the winter season.

 

Home || City Government || Departments & Services || Community Profile || FAQ
New to the City? || Helpful Links


 The City of Savage  |  6000 McColl Drive  |  Savage, MN   55378-2464 
Phone: 952.882.2660  |   
Savage Logo Horse