 |
 |
 |
Administration
Finance
Public Works
Snow Removal
Street Maintenance
Utility Services
Parks
Public Safety
Engineering
Building Inspections
Economic Development
Community Development
|
 |
Spring Maintenance
The City staff performs several spring street maintenance tasks:
Street Sweeping - Operations continue through the first part of April. Collector streets will be completed first and then neighborhood streets will be next.
Tree Trimming - Occuring along street and boulevard areas to clear branches that may interfere with sight distance or clearance issues. Tree branches will be pruned and debris will be removed by City crews.
Potholes - City crews begin pothole patching the end of March and continue through April. To report a pothole, please call the Public Works Department at 952-224-3400.
Street Maintenance
In
addition to routine citywide pothole repairs, the City's Street Preservation Program focuses
on scheduled
preventative maintenance in specific neighborhoods each year. The program is designed to extend the life
of streets by sealing cracks, conducting spot overlays, correcting drainage problems, and carrying out surface
treatments such as chip sealing or micro surfacing.
Street Sweeping Procedures
All
surfaced City streets, parking lots, medians and City maintained sidewalks are swept in the spring of the year (beginning
the first week of April if weather permits) and again in the fall (typically at the end of September). Spot sweeping
occurs during the summer months as needed after a rain, an accident that has resulted in debris on the road, or at the
request of a resident.
|